<i id='smjuS'><tr id='smjuS'><dt id='smjuS'><q id='smjuS'><span id='smjuS'><b id='smjuS'><form id='smjuS'><ins id='smjuS'></ins><ul id='smjuS'></ul><sub id='smjuS'></sub></form><legend id='smjuS'></legend><bdo id='smjuS'><pre id='smjuS'><center id='smjuS'></center></pre></bdo></b><th id='smjuS'></th></span></q></dt></tr></i><div id='smjuS'><tfoot id='smjuS'></tfoot><dl id='smjuS'><fieldset id='smjuS'></fieldset></dl></div>
        <bdo id='smjuS'></bdo><ul id='smjuS'></ul>
        <legend id='smjuS'><style id='smjuS'><dir id='smjuS'><q id='smjuS'></q></dir></style></legend>

        <small id='smjuS'></small><noframes id='smjuS'>

      1. <tfoot id='smjuS'></tfoot>

          <i id='smjuS'><tr id='smjuS'><dt id='smjuS'><q id='smjuS'><span id='smjuS'><b id='smjuS'><form id='smjuS'><ins id='smjuS'></ins><ul id='smjuS'></ul><sub id='smjuS'></sub></form><legend id='smjuS'></legend><bdo id='smjuS'><pre id='smjuS'><center id='smjuS'></center></pre></bdo></b><th id='smjuS'></th></span></q></dt></tr></i><div id='smjuS'><tfoot id='smjuS'></tfoot><dl id='smjuS'><fieldset id='smjuS'></fieldset></dl></div>
            <bdo id='smjuS'></bdo><ul id='smjuS'></ul>
            <legend id='smjuS'><style id='smjuS'><dir id='smjuS'><q id='smjuS'></q></dir></style></legend>

            <small id='smjuS'></small><noframes id='smjuS'>

          1. <tfoot id='smjuS'></tfoot>

            Current location:HOME > NEWS > Company News >

            Mingjie EquipmentMingjie

            0519-68880156
            0519-68880180

            Mingjie EquipmentSearch The Product

            More than 30 years of experience in mechanical equipment manufacturing

            How can the aerated concrete equipment manufacturers work at low temperature?

            Time:2020-09-02
            In concrete production, this process is not easy, from the beginning of batching to manufacturing needs a lot to the process, each step of the process is crucial, if a wrong step will be wrong, today's discussion is low temperature aerated concrete equipment manufacturers how to pour work?
             
            In our daily life, low temperature refers to the temperature above zero degrees Celsius. This temperature is very suitable for aerated concrete equipment to pour blocks. The chemical reaction rate is very slow at this low temperature, and the hardness is low. It takes a long time to demolish the mold. After repeated verification, in the first 28 days, In the hardening trend of the poured aerated concrete blocks, the temperature at 23 degrees Celsius is higher than that at 13 degrees Celsius, which has the opposite effect in the later changes.
             
            If we want the aerated concrete equipment to produce good quality blocks, do not allow any one step wrong, in order not to let our work to pay attention to a little detail, do the best.
             
            Aerated concrete equipment manufacturer: Changzhou Mingjie Building Materials Equipment Manufacturing Co., Ltd. - with more than 30 years of mechanical equipment manufacturing experience. With rich experience in mechanical processing, strong economic strength and solid technical foundation, Mingjie has been in a leading position in the aerated concrete equipment manufacturing industry. Tel: 0086-519-68880158
             
                <i id='smjuS'><tr id='smjuS'><dt id='smjuS'><q id='smjuS'><span id='smjuS'><b id='smjuS'><form id='smjuS'><ins id='smjuS'></ins><ul id='smjuS'></ul><sub id='smjuS'></sub></form><legend id='smjuS'></legend><bdo id='smjuS'><pre id='smjuS'><center id='smjuS'></center></pre></bdo></b><th id='smjuS'></th></span></q></dt></tr></i><div id='smjuS'><tfoot id='smjuS'></tfoot><dl id='smjuS'><fieldset id='smjuS'></fieldset></dl></div>
                  <bdo id='smjuS'></bdo><ul id='smjuS'></ul>
                      <legend id='smjuS'><style id='smjuS'><dir id='smjuS'><q id='smjuS'></q></dir></style></legend>

                      <small id='smjuS'></small><noframes id='smjuS'>

                        <tbody id='smjuS'></tbody>

                    • <tfoot id='smjuS'></tfoot>

                      Continuous innovation and
                      research and development

                      Customized design innovation

                      Aerated concrete equipment solutions

                      With more than 30 years of experience in mechanical equipment manufacturing, the company has strong technical force, and has invested more than 100 million to purchase and improve the company’s production and testing equipment